Skip to main content

Projects

Home / Projects / Das Island Temporary Jetty for ADNOC

Das Island Temporary Jetty for ADNOC

Design, detail engineering, supply of materials and construction of a 100 m temporary jetty.

For ADNOC on Das Island, HTC is delivering a 100 m temporary jetty on an EPC turnkey basis. The scope includes design and detailed engineering, the supply of all materials and the full construction of the jetty. The structure will provide marine access to support construction activities on the island, and is being built under ADNOC's HSE and quality requirements.

HTC's engineering team is responsible for the design and detailed engineering of the jetty, while the procurement of materials and the marine works are managed within the same group. Our marine fleet supports the delivery of materials to the island and the installation of the jetty structure.

Project Goals

The aim of the project is to provide a safe and reliable marine access point that supports ADNOC's construction activities on Das Island.

  • Complete the design and detailed engineering of the 100 m jetty.
  • Supply all materials required for construction.
  • Construct the jetty to ADNOC's HSE and quality standards.
  • Provide dependable marine access for the duration of the island works.

On completion, the temporary jetty will be handed over to ADNOC with full quality documentation, ready to support marine operations on the island.