FEATURED PROJECTS
Every project has its unique DNA
ADYARD Quay Repair Works
Year: 2013 Client: ADYARD
Location: Abu Dhabi – UAE
Description: Realization of a new quay wall with a total length of 500m for ADYARD (Topaz) in Musaffah, Abu Dhabi including the demolishing of the old jetty structure.
Emirates LNG Reclamation Project
Year: 2013
Client: Government of Fujairah, Fujairah Municipality
Location: Fujairah – UAE
Description: Reclamation of land and coastal protection for development of LNG terminal in Fujairah
Port of Fujairah Northern Breakwater
Year: 2013-2015
Client: Port of Fujairah / Government of Fujairah Location: Fujairah – UAE
Description: Port of Fujairah Northern Breakwater Project for enclosing of OT2 harbour basin. The total length of the breakwater is 3km. It extends into deep water to a depth of 26m.
Fujairah Northern Land Reclamation Project
Year: 2012 (completed)
Client: Vopak Horizon Fujairah LLC Location: Fujairah – UAE
Description: Extension of the VHFL offshore jetty with a new tier on top of the existing bridges in order to accommodate new pipes. The project comprised complete re-design of the jetty.
Oil Terminal Expansion of the Port of Fujairah
Year: 2008 – 2009
Location: Fujairah – UAE Client: Port of Fujairah
Description: Detailed design, guidance of the tender process and supervision over the construction works of Oil Terminal 2 phase 1 for the Port of Fujairah. The terminal comprises a new quay wall with a length of approx 1.7 for handling oil tankers up to 180,000 DWT, dredging of the entrance channel and harbour basin, reclamation and coastal protection works.
Evacuation Berthing Facility Das Island
Year: 2012 (completed) Client: ADNOC
Location: near Abu Dhabi – UAE
Description: Detailed design of Evacuation Berthing Facility at Das Island in exposed water, suitable for large supply vessels and small crew boats.
Port of Fujairah, OT2 Phase 1
Year: 2008-2010 (completed) Client: Port of Fujairah
Location: Fujairah – UAE
Description: Realisation of a quay wall for Port of Fujairah Oil Terminal 2, Phase 1 Including construction of 1.5km of combi wall with a retaining height of 22.8m, 800m of deep water breakwater and 5 million m3 of dredging and reclamation. After completion the facility is able to receive 4 tankers up to a size of 200,000 DWT or 8 handy size tankers.
Port of Fujairah VLCC Berthing Facility Dredging
Year: 2014
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Creating a dredged pocket for Port of Fujairah VLCC Berthing Facility. Total volume of 2 million m3 of dredging to a depth of -26m.
Masterplan Port of Fujairah Expansion Project
Year: 2007-2008
Location: Fujairah – UAE Client: Port of Fujairah
Description: The Port of Fujairah desired to expand its capacity in the export of aggregates and the oil bunker trade. MUC has made throughput analyses, developed harbour layouts, executed ship manoeuvring and mooring analysis and investigated feasibility of several solutions for marine structures in the port such as breakwaters and quay walls.
Al Taweelah Fisherman Harbour
Year: 2013
Location: Abu Dhabi – UAE
Description: Development of Fisherman Harbour including quay walls, breakwaters and dredged basin.
Concord Oil Terminal
Year: 2013-2014
Client: Concord Energy
Location: Fujairah – UAE
Description: Green field development of an Oil Storage Terminal with a total capacity of 1,000,000 m3 including all earthworks, tank structures, pumps, offices and other related infrastructure.
IL&FS Tank Terminal
Year: 2013-2014
Client: IL&FS Prime Terminal
Location: Fujairah – UAE
Description: Green field development of an Oil Storage Terminal with a total capacity of 600,000 m3 including all earthworks, tank structures, pumps, offices and other related infrastructure.
Northern Pipe Rack 3
Year: 2013-2014
Client: Port of Fujairah
Description: Construction of Pipe Rack structure with a total length of 950m to connect Oil Terminals in Fujairah Oil Industry Zone with the Port of Fujairah.
Socar Aurora Oil Terminal
Year: 2011-2012 (completed)
Client: Socar Aurora
Location: Fujairah – UAE
Description: Green field development of an Oil Storage Terminal with a total capacity of 350,000 m3 including all earthworks, tank structures, pumps, offices and other related infrastructure.