Skip to main content

Blog Details

Home / Blog / Blog Details

Rock breakwater under construction Projects

Breakwater works completed ahead of schedule

HTC has completed breakwater works ahead of the agreed schedule, giving our client early access to a protected harbour basin.

The works involved the placement of core, filter and armour rock to the design profile, carried out by our marine plant with close survey control. Careful planning of rock supply and marine transport allowed placement to continue steadily, even during periods of challenging weather.

Project highlights

  • Breakwater completed ahead of the contract programme.
  • Rock layers placed to design profiles and tolerances.
  • Works delivered safely with no lost-time incidents.

Finishing early is the result of good planning, the right equipment and a team that knows marine construction. We are proud to hand over a structure that will protect the harbour for decades.

Project Manager, HTC

Final surveys have confirmed that the breakwater meets the design requirements, and the as-built documentation has been handed over to the client.

Marine works on siteHTC crew at work

What's next

With the breakwater in place, works inside the sheltered basin can proceed, and HTC looks forward to supporting the next phases of the development.